Before you can begin testing, your PAT250 must be connected to CertSuite, and the ‘PAT250’ icon in CertSuite must be green.
- Make sure that all the visual checks on the appliance have passed.
- Then plug in the appliance that you want to test.
- Start by tapping the green 250 test button in CertSuite.
- The test screen appears, showing which tests will be carried out.
- Tap the green ‘Go’ button to start the test.
- A test can be stopped at any time by tapping one of the red stop buttons or the PAT250 power button.
- For each test there are instructions, and a countdown in seconds.
In most cases, when one test finishes, the next automatically begins, until all the tests are completed, but there are exceptions ...
- When the PAT250 is powered by mains, the leakage and RCD tests do not start automatically.
- You must press the 'Go' button to start the insulation test.
- Once it has passed you must press the 'Go' button again to start the leakage test, and move the slider from left to right.
- Once the test has finished, and the appliance has passed, you can close the test window.
- The test results appear in the CertSuite page for that appliance.