Copy Job - 1. Without test results; 2. With test results [03-0102]

To copy an existing Job ...

  1. In the 'Current Jobs' table, select the job you want to copy
  2. Select 'Copy' from the blue 'Actions' tab (last column on the right)
  3. In the 'Copy Job' menu, select the type of certificate/report that you want to create
  4. Name the new certificate/report: if you do not name it, the existing name is used with '– Copy' added

1. Copy without test results

  • Follow steps 1-4 above, but leave the ‘Copy results’ box unchecked
  • Click ‘create’, and the copied job will appear in the jobs table, without any test results

2. Copy with test results

  • Follow steps 1-4 above, but make sure to check the ‘Copy results’ box
  • Click the 'Confirm' button: in doin gso you take responsibility for verifying that all of the results recorded in the certificate/report are accurate: this should be done by a QS (Qualified Supervisor)
  • Click 'Create': the new job appears in the 'Current Jobs' table
  • It will include the test results and the observations that appear in the original

Note that the certificate numbers of the original and the copied jobs are different: this is because all certificate numbers must be unique, whether jobs are copied or not.

Watch the video 'How to Copy a Job - without test results, and with test results'.

Any questions or feedback, please contact software@megger.com

[Article 03-0102-03]

Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.

Still need help? Contact Us Contact Us