Copy Job with Test Results etc. [03-0103]

To create a Copy of a Job that includes all the details of the original job – including test results and observations:

  1. In the 'Current Jobs' table, select the job you want to copy
  2. Select 'Copy' from the blue 'Actions' tab (last column on the right)
  3. In the 'Copy Job' menu, select the type of certificate/report you want
  4. Name the new certificate/report: if you do not name it, the existing name is used with '– Copy' added
  5. Tick the 'Copy results' box
  6. Click the 'Confirm' button
  7. Note that in clicking 'Confirm' you are taking responsibility for verifying that all of the results recorded in the certificate/report are accurate: this should be done by a QS (Qualified Supervisor)
  8. Click 'Create'
  9. The new job will appear in the 'Current Jobs' table

Watch the 'How To' video 'Copy a Job - 1) without test results 2) with test results'

Contact our support if you have any questions about copying a job with the results included: software@megger.com

[Article 03-0103-03]

Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.

Still need help? Contact Us Contact Us